Related Diary pages
Result 91 of 95

Vol.17.p.219
Display page dates: 02/25/1926; 02/26/1926

Diary Transcription: microfilm: begin page 219

Thursday, February 25, 1926 (continued)

(2) Street G 7000 S and G 7152
Reached the corner (southwest corner) of G 7152. The back wall is built on hard reddish stratum (geological) and is a meter or more higher at foot than the east wall.
Turned east along south side of G 7152.

(3) G 7152
Having exposed west wall of G 7152 in clearing street G 7000 S, began clearing south of G 7152. The ground has been worked over by sebbakheem.
Rubble wall is appearing parallel to G 7152 end.

Friday, February 26, 1926.
Eighty-fifth day of work.

Workmen:
Quftis: 78

Work on:
(1) G 7000 X (no work)
(2) G 7152
(3) G 7154

Cars emptied, see end

(1) G 7000 X
Dows Dunham and Husein (the engineer) took the day off and no work was done on G 7000 X.

(2) G 7152
Clearing east over G 7154 exposed south wall of G 7152.
[ILLUSTRATION]

(3) G 7154
G 7154 lies south of G 7152. The front wall is of small blocks of stone. The front of G 7154 appears another later mastaba (G 7155) of rubble. The space between was filled with rubbish and there are several plundered pits of the late period. The late pits and the modern sebbakh digging have obscured the order of the older walls and the area is not yet fully excavated.

microfilm: end page 219


End of Diary Transcription
Mentioned On This Page:

People:
Husein
Dows Dunham American, 1890–1984
MFA Document